By using this site, you agree to the Privacy Policy and Terms of Use.
Accept
Today in CanadaToday in CanadaToday in Canada
Notification Show More
Font ResizerAa
  • Home
  • News
  • Lifestyle
  • Things To Do
  • Entertainment
  • Health
  • Tech
  • Travel
  • Press Release
  • Spotlight
Reading: 2 little birds may delay opening of Acadia University’s new nursing building
Share
Today in CanadaToday in Canada
Font ResizerAa
  • News
  • Things To Do
  • Lifestyle
  • Entertainment
  • Health
  • Travel
Search
  • Home
  • News
  • Lifestyle
  • Things To Do
  • Entertainment
  • Health
  • Tech
  • Travel
  • Press Release
  • Spotlight
Have an existing account? Sign In
Follow US
Today in Canada > News > 2 little birds may delay opening of Acadia University’s new nursing building
News

2 little birds may delay opening of Acadia University’s new nursing building

Press Room
Last updated: 2025/05/15 at 6:26 AM
Press Room Published May 15, 2025
Share
SHARE

Two little birds have caused delays in the construction of a new nursing building at Acadia University and could ultimately affect the opening of the facility.

The University Club on Westwood Avenue in Wolfville, N.S., was expected to be demolished in January to make way for the new building, with construction set to begin last month.

But nature has thrown a wrench into the works.

Last summer, Birds Canada spotted two chimney swifts entering one of the University Club’s chimneys.

Chimney swifts are a species at risk, and destruction of their habitat is prohibited without a permit.

The university made an application to Environment and Climate Change Canada for a permit to destroy the chimney as part of the demolition, and after a 90-day review period, ECCC issued the permit.

This building on Westwood Avenue at Acadia University is scheduled to be demolished in June to make way for the new nursing building. (Mark Davidson/Acadia University)

The chimney was capped, and the building is now scheduled to be demolished in mid-June. Construction of the new nursing building is now slated to begin in September.

A university spokesperson says the delays mean the opening of the new building, originally scheduled for fall 2026, may be delayed.

The province is investing $13.9 million to help build the facility, which will include a dry lab, clinic teaching spaces and simulation rooms. 

Acadia’s nursing program, which began in September 2023 with 21 students, had 63 students in the 2024-25 academic year, and expects another 63 to begin this fall.

Swifts use other campus chimneys

The chimney at the University Club is not the only one on campus frequented by swifts.

University Hall also has an active chimney swift roost. As part of the ECCC permit, that site must be monitored for three years.

Samuel Jean, Acadia’s conservation and education technician, will be leading the monitoring and conservation efforts.

A man stands with a clipboard in front of a white academic building.
Samuel Jean is the conservation and education technician at Acadia University. He is leading the monitoring efforts for another chimney swift roost on campus at University Hall, pictured in the background. (Reggie Grey/Acadia University)

The spring monitoring will take place between May 17 and June 2, and more monitoring will be done in the summer and autumn.

Jean says crews will sit outside the chimney about an hour before sunset, being very still and quiet, and try to count the number of birds that fly into the chimney. Cameras will also be used to record the birds flying into the chimney so a more accurate count can be completed by watching the video.

The highest number of swifts recorded at the site was 810 in 2021.

“It’s super impressive to watch,” Jean says. “A few hours before they go in, they gather and they circle and circle and circle. And then at some point they start going in in little groups. It’s a nice phenomenon to witness.”

A white turret on a building with a green roof.
Hundreds of chimney swifts roost in this chimney at University Hall at Acadia University. (Reggie Grey/Acadia University)

Chimney swifts are unable to perch on flat surfaces, instead requiring a vertical surface. They often roost in hollow trees, chimneys, wells and barns.

Jean says he’s happy to help monitor the birds on campus.

“They’re nice to have around. They’re good neighbours,” he says.

“Biodiversity as a whole is an important thing to protect. We share this land with so many other creatures and I think we all deserve to be here. So it’s important to find ways that we can live together and share that space.”

Quick Link

  • Stars
  • Screen
  • Culture
  • Media
  • Videos
Share This Article
Facebook Twitter Email Print
What do you think?
Love0
Sad0
Happy0
Sleepy0
Angry0
Dead0
Wink0
Leave a comment

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

You Might Also Like

News

Iqaluit blizzard shuts services, closes schools

May 15, 2025
News

World junior players’ group chat about Hockey Canada investigation under scrutiny as ex-teammate testifies

May 15, 2025
News

The latest in the hockey sex assault trial

May 15, 2025
News

13 Trudeau-era ministers survive Carney’s cabinet overhaul

May 15, 2025
© 2023 Today in Canada. All Rights Reserved.
  • Privacy Policy
  • Terms of use
  • Advertise
  • Contact
Welcome Back!

Sign in to your account

Lost your password?