By using this site, you agree to the Privacy Policy and Terms of Use.
Accept
Today in CanadaToday in CanadaToday in Canada
Notification Show More
Font ResizerAa
  • Home
  • News
  • Lifestyle
  • Things To Do
  • Entertainment
  • Health
  • Tech
  • Travel
  • Press Release
  • Spotlight
Reading: Eyesore from oil and gas era being dismantled in Tuktoyaktuk, N.W.T.
Share
Today in CanadaToday in Canada
Font ResizerAa
  • News
  • Things To Do
  • Lifestyle
  • Entertainment
  • Health
  • Travel
Search
  • Home
  • News
  • Lifestyle
  • Things To Do
  • Entertainment
  • Health
  • Tech
  • Travel
  • Press Release
  • Spotlight
Have an existing account? Sign In
Follow US
Today in Canada > News > Eyesore from oil and gas era being dismantled in Tuktoyaktuk, N.W.T.
News

Eyesore from oil and gas era being dismantled in Tuktoyaktuk, N.W.T.

Press Room
Last updated: 2026/09/27 at 8:42 PM
Press Room Published September 27, 2026
Share
Eyesore from oil and gas era being dismantled in Tuktoyaktuk, N.W.T.
SHARE

Listen to this article

Estimated 4 minutes

The audio version of this article is generated by AI-based technology. Mispronunciations can occur. We are working with our partners to continually review and improve the results.

A 40-foot steel structure used for oil and gas exploration in the Beaufort Delta has been moved for the first time in decades.

Known as a “caisson retained island,” the structure was originally built in the 1970s for offshore drilling, according to the N.W.T. Department of Infrastructure. When placed on the sea bed in shallow water, it would provide a stable base for a drilling rig.

It was anchored in the harbour at Tuktoyaktuk, N.W.T., in 1989. It sat there until a few years ago, when a storm broke it free and it beached.

Marine Recycling Corporation (MRC), a salvage company from Ontario, was hired last year to move the unit. The company came up with a plan and executed it this past month.

The caisson weighs approximately 12,000 tons, which meant MRC needed help to move it.

Terry Camsell, the director of the N.W.T. government’s Marine Transportation Services (MTS), said salvagers worked with local leaders and companies to think of a solution.

“It’s not as if you can go in there with a couple of tugs and pull it out,” said Camsell.

A giant structure in the middle of water.
A view of the caisson in the Tuktoyaktuk harbour. (N.W.T. Department of Infrastructure)

Camsell said the salvage crews scheduled the arrival of two tug boats owned by MTS. Together with the tugs, the crews were able to move the caisson off the beach and across the harbour, where they secured it to a dock close to the MTS yard in Tuktoyaktuk.

The crews at Marine Recycling Corporation ran tow lines to shore that were nine inches in diameter. Chain tensioners were used to pull with 2,000 tons of force to move the caisson away from the shore where it had been beached for the last three years. At that time, a storm surge had broken the anchor lines that kept the structure in the middle of the harbour.

A boat next to a large structure.
Tugboats and salvage crews have moved the caisson away from the shore. (N.W.T. Department of Infrastructure)

“It’s good to see it floating again and the community is really happy,” said Darrel Nasogaluak, the chair of the Tuktoyaktuk Community Corporation.

“Even on social media, I see posts about people saying they have their view back, of the harbour.”

Nasogaluak said people have been driving up to the new location, which is an old dock used by oil and gas companies.

“It’s one of the last things left from the ’60s and ’70s oil boom, that’s kind of been an eyesore in the community,” he said.

Jordan Elliott, the project manager with MRC and the company’s president, said the plan is to use the metal from the caisson to strengthen the docks in the harbour.

The former owner left residual fuel in the tanks of the caisson. Elliott said the oil will be burned by a local company for heating fuel this winter.

Crews are working this month to ballast the caisson to the bottom of the harbour where it is currently sitting, and where it will be dismantled into eight parts.

Before the metal can be used for dock materials, the project must be approved by local regulatory boards.

“There are a lot of permitting requirements when building docks and infilling harbours and that,” said Elliott.

No timeline was given on when the dock work would begin.

A giant structure in the middle of water with ships zooming away from it.
The caisson will be dismantled and its parts repurposed. (N.W.T. Department of Infrastructure)

Camsell said the caisson was not the last structure still left abandoned in the N.W.T.

A steel drilling caisson, a super tanker sitting on an inverted barge underwater, is still in the Beaufort Sea.

“That is still sitting off of Stokes Point, close to Herschel Island — there has been some discussion for years about what to do with that,” said Camsell.

A company in Norway owns the offshore drilling rig. Camsell said there have been talks with the company about what to do with it.

“They want to sell it, or they will have to take it out and scrap it. That is something they are responsible for,” said Camsell.

“It weighs more than the Tuk harbour caisson, so it will be much more work.”

Quick Link

  • Stars
  • Screen
  • Culture
  • Media
  • Videos
Share This Article
Facebook Twitter Email Print
What do you think?
Love0
Sad0
Happy0
Sleepy0
Angry0
Dead0
Wink0
Leave a comment

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

You Might Also Like

How do you grow N.L.’s population? Province wants feedback as fertility rate hits record low
News

How do you grow N.L.’s population? Province wants feedback as fertility rate hits record low

September 27, 2026
Coyote killed in Cape Breton Highlands National Park, but closures still in place
News

Coyote killed in Cape Breton Highlands National Park, but closures still in place

September 27, 2026
B.C. family still looking for answers 1 month after deadly Nepal flood
News

B.C. family still looking for answers 1 month after deadly Nepal flood

September 27, 2026
Pilot identified in fatal helicopter crash outside of Montreal
News

Pilot identified in fatal helicopter crash outside of Montreal

September 27, 2026
© 2023 Today in Canada. All Rights Reserved.
  • Privacy Policy
  • Terms of use
  • Advertise
  • Contact
Welcome Back!

Sign in to your account

Lost your password?